← Back to catalog
CP-4

Contingency Plan Testing

Contingency Planning (CP)
Baselines
Low · IncludedModerate · IncludedHigh · Included
Description

Test the contingency plan for the system [assignment] using the following tests to determine the effectiveness of the plan and the readiness to execute the plan: [assignment]. Review the contingency plan test results; and Initiate corrective actions, if needed.

Discussion

Methods for testing contingency plans to determine the effectiveness of the plans and identify potential weaknesses include checklists, walk-through and tabletop exercises, simulations (parallel or full interrupt), and comprehensive exercises. Organizations conduct testing based on the requirements in contingency plans and include a determination of the effects on organizational operations, assets, and individuals due to contingency operations. Organizations have flexibility and discretion in the breadth, depth, and timelines of corrective actions.

Implementation guidance

No content available.

CSF 2.0 crosswalk
ID.IM-02Identify
RC.RP-03The integrity of backups and other restoration assets is verified before using them for restorationRecover